project photos



City of San Diego
Phase A, Rehabilitation of 700 Manholes using Sancon 100

City of San Diego
South Metro Interceptor, Repair 5 miles of T-Lock lined 84" diameter live sewer pipe.

Midway Sanitary District

Manhole Rehabilitation 03, Rehabilitation of 245 sewer manholes using Sancon 100

OCSD
Headworks C Pipe Repairs, Installed (9) 42" diameter
Link-Pipe® (man-entry)

Costa Mesa Sanitary District
Manhole and Wetwell Rehabilitation, Rehabilitate 86 manholes and 6 wetwells using Sancon 200

City of San Diego

Primary Sedimentation Tank Lining, Line 8 Sedimentation tanks using Sancon 100

City of Carlsbad

Villas Lift Station, Rehabilitation of sewer wetwell using Ameron Arrowlock

LACDPW

Culver Lining, CIPP lining of 100 Storm Drain Culverts using CIPP and Sancon 100

OCSD

Coast Trunk Siphon Modifications, Downsize 84" Siphon to 36" using Danby

 

 